RTC recently completed various repairs that were deemed to be an Immediate need at the North Tower of the IAH Marriott.
– REPLACEMENT OF CORRODED SECTION OF AN EXISTING STEEL EXHAUST STACK AND WATERPROOFING
-NEW DECK DRAIN INSTALLATION AND DRAIN LINE WITH CONCRETE POUR BACK AND TRAFFIC COATING
-CHEMICAL URETHANE GROUT INJECTION OF LEAKING CRACKS SITE SEALANT REPLACEMENT